CERN | Accelerating science
Sign In Directory
Warm magnet Interlock Controller
  • HOME
  • DOCUMENTATION
    • Engineering Specifications and Work Package Descriptions
    • Engineering Change Requests
  • SYSTEM
    • Hardware
    • Rack’s location
      • AD – ELENA
      • EAST AREA
      • HIE-ISOLDE
      • INJ LINAC4-PSB / EJT PSB-PS
      • LHC
      • LINAC3 – LEIR
      • LINAC4
      • PS – TT2/nTOF – TT10
      • SPS
      • TI2 TI8 TT40 TT60 – TT41/TT43(AWAKE)
      • TT20
      • TT66 HIRADMAT
      • PS-BOOSTER
    • Software and Configuration
    • Asset management
    • EN-EL documentation
    • Presentations
    • Future projects
  • OPERATION
    • Procedures
    • Contacts
      • The WIC Team TE/MPE
      • Machine
      • Service
      • Radio Protection
    • Operation links
    • HWC procedures
  • LINKS

EN-EL documentation

DIR template – DIC template – DEC template

WIC cabling conventions : MCI13, 2, Profibus

All convention cablage EN/EL

Link to Decabling project 

decabling
CERN Logo

CERN
Esplanade des Particules 1
P.O. Box
1211 Geneva 23
Switzerland

Check CERN Social Accounts

  • Contact
Copyright © 2026 CERN